Shipbuilding · 2025Transport Risk

260t Block — Weld Connection Risk

SPMT acceleration introduced lateral loads not accounted for on a tack-welded HSS-to-keel connection, with personnel nearby during extraction.

Situation

Two 6-axle SPMTs extracting a 260t block. Lateral loads from acceleration not in the original design.

Outcome

FEA + first-principles weld calc. 0.05g acceleration limit recommended. P.Eng approved — risk eliminated.

FEMAPFirst PrinciplesCSADNV
Shipbuilding · 2025FEA Audit

FEA Peer Review — Non-Physical Loads

A 10-lug equalizer lift model produced unequal load distribution despite being designed to share load evenly.

Situation

Lug connections modelled with fixed constraints instead of RBE3 elements, creating artificial stiffness.

Outcome

Corrected model, verified with freebody diagrams. Authored a company-wide FEA guide on RBE3 usage.

FEMAPRBE3Freebody Analysis
Shipbuilding · 2025Design Constraints

80t Workstation — Structural vs Transport

A pin jig layout concentrated heavy loads exactly where SPMT access needed to stay clear — a direct conflict.

Situation

Non-uniform geometry overloaded existing jigs in the SPMT zone. Block also found outside crane reach.

Outcome

Jack stands aligned to bulkheads resolved the overload. Block relocation avoided rework and delay.

FEMAPAISC 360SPMT Planning
Shipbuilding · 2025Optimisation

Lift Bracing Redesign — 60% Reduction

A bracing design not guided by structural load paths required excessive material and welding.

Situation

Bracing distributed uniformly rather than along primary load paths — unnecessary fabrication complexity.

Outcome

FEA-guided redistribution cut bracing by ~60%. Weld geometry simplified, integrity FEA-verified.

FEMAPLoad Path AnalysisDFM
Offshore · Bright Engineering B.V.Failure Investigation

Filter Drum: 6 Months → 12+ Years

An industrial filter drum fractured at critical locations after only 6 months of service.

Situation

Recurring fractures, root cause unknown. Client needed a long-term fix without full replacement.

Outcome

FEA identified fatigue as root cause. Load path redesign extended service life to 12+ years.

Linear FEAFatigue Analysis
Shipbuilding · 2025Lifecycle Engineering

Full Keel Block — All Fabrication Stages

A full-breadth keel block required engineering input across extraction, transport, blocking, and lifting.

Situation

Fabricated lug plate found thinner than specified during lift plan development.

Outcome

FEA confirmed adequacy under straight-lift conditions only — documented and executed safely.

FEMAPCSALift Planning
FEA Case Studies

Technical work, shown in detail.

Worked FEA examples — the model, the analysis, and what the results actually mean. Each opens as a full walkthrough.

Notable projects

Selected project highlights

2025 — Present · CanadaShipbuilding

Ship Block Heavy Lift & Transport

FEA-based structural verification for lifting, rotation, transport, and workstation support of ship block assemblies up to 250t, including blocks for a Canadian Coast Guard vessel program.

FEMAPNX-NastranCSADNVAISC 360
2021 — 2023 · Bright Engineering B.V.Offshore Wind

3000t Lifting Connector

Performed structural FEA and contributed to detail engineering of a 3000-tonne hydraulic lifting connector for offshore pile installation, through to DNV-approved construction documentation.

FEMAPSolid EdgeMathcadDNV
2020 — 2021 · Bright Engineering B.V.Offshore Wind

Monopile Gripper

Contributed to structural analysis and detail engineering of a custom offshore lifting tool for monopile installation, through to Lloyd's Register-approved construction drawings.

FEMAPSolid EdgeLloyd's Register
2017 — 2021 · Bright Engineering B.V.Offshore

Loading Towers & Carousels

Structural analysis and sea fastening calculations for cable-lay loading towers and carousels, including detailed ship deck FE models for underdeck stress verification.

FEMAPDNV RU-shipMathcad
2017 · Bright Engineering B.V.Industrial

Filter Drum Fatigue Redesign

Failure investigation and structural redesign of an industrial filter drum fracturing after 6 months of service — fatigue life extended to 12+ years.